Inspection Pass Rate

A QC readiness KPI. Distinct from punch-list completion, which tracks deficiency close-out after inspection findings.

Pass % = inspections passed ÷ inspections performed × 100.

Tip: Keep “Passed Inspections” and “Total Inspections” on the same basis (scope and counting rules) before you calculate.

Cluster: Construction hub · Safety TRIR · CPI · SPI · Percentage guide

Inspection pass rate is the share of inspections (ITP hold points, municipal, or third-party) that passed first time.

Enter passed inspections and total inspections for the same period.

Inspections that passed
All inspections in the period

Inspection Pass Rate

Understanding Inspection Pass Rate

How we calculate. Pass % = inspections passed ÷ inspections performed × 100. See our methodology and accuracy policy .

Real-world scenario: A typical Inspection Pass Rate case uses passed inspections 88 and total inspections 100. Enter the same figures below to reproduce the worked path.

What is Inspection Pass Rate?

A QC readiness KPI. Distinct from punch-list completion, which tracks deficiency close-out after inspection findings.

  • Same inspection set
  • Pass = accepted without re-inspection per policy
  • Segment by trade

The Formula

Inspection Pass Rate
Pass % = (Passed inspections ÷ Total inspections) × 100

Worked Example

Scenario: 88 passed of 100 inspections.
Step 1: 88 ÷ 100 = 0.88
Step 2: × 100 = 88%
Answer: Inspection pass rate is 88%.

Common Use Cases

  • ITP tracking: first-time quality
  • Trade scorecards: re-inspection load
  • Owner QA: inspection health

Pro Tips

  • Don’t count waived holds as passes unless labeled
  • Track fail reasons
  • Pair with punch list completion
ScenarioWhen to use
Percent of a numberFinding a part of a whole (tax, tip, score)
Percent changeComparing old vs new values

Limitations: Inspection Pass Rate results are educational construction planning aids—not engineering, safety, legal, or cost-estimating advice. Confirm definitions with your project controls, safety, and contract documents. For earned-value SPI/CPI see the Professional hub.

Common mistakes

  • Swapping part and whole: The denominator must be the full total, not a subset.
  • Rounding too early: Carry extra decimal places through multi-step work before rounding the final percent.
  • Mixing percent and decimal forms: Enter rates in the format the calculator labels expect.

The worked example for inspection pass rate was verified with the calculator form on this page—enter the same values to confirm the result.

When to use this calculator

  • Use this page when your wording matches inspection pass rate and the form labels on screen.
  • Use percent of a number for “what is X% of Y?” problems.
  • Use number is what percent when you know part and whole and need the percent.

Still unsure about inspection pass rate? Start with the quick answer above, then open the linked calculator that matches your wording.

Frequently Asked Questions

How do I use this inspection pass rate calculator?

For inspection pass rate, enter the values labeled on the form, then press Calculate. Compare the result to the worked example on this page.

What formula does this page use?

See the quick answer and formula box above for inspection pass rate—the same percentage calculator expression is applied to your inputs.

What if my result looks wrong?

When checking inspection pass rate, re-check part vs whole (or rate vs base), rounding, and whether percents were entered as 25 rather than 0.25 when the form expects percents.

Authoritative References

For construction project controls and safety rate concepts, consult:

  • OSHA — workplace safety resources
  • PMI — project management practices
  • AIA — contract and project delivery context